Milestone Materials, Rochester Sand and Gravel - North Quarry Project
Environmental Assessment Worksheet (EAW)
Review Period
A 30-day public review and comment period is open from April 4, 2011 through May 4, 2011. Public notice of the availability of this EAW is in the April 4, 2011 EQB Monitor
.
The proposed project
Milestone Materials, a Division of Mathy Construction Company proposes an expansion of an existing sand pit and limestone quarry aggregate mining operation within the Rochester Sand and Gravel, North Quarry (an approximate 70 acre site). The expansion of aggregate mining operations involves the extraction of limestone aggregate from 60 feet to 120 feet below grade. Extraction of the limestone aggregate requires proposed dewatering by appropriating approximately 4,000 million (4 billion) gallons of water annually (or 333.3 million gallons of water per month) to access the limestone deposit. In addition, aggregate washing will occur on-site. The water appropriated for dewatering will be discharged to the South Fork of the Zumbro River after treatment within a series of settling ponds which will be constructed on site. Progressive reclamation of the site will occur as extraction of aggregate resources is completed on the site. The total project site is approximately 135 acres. The proposed project is located in Cascade Township in Olmsted County, Minnesota.
Send comments
Written and signed comments on the EAW must be received by Wednesday, May 4, 2011 at 4:30 p.m.
By mail:
Minnesota Department of Natural Resources
Division of Ecological and Water Resources, Box 25
Attn: Charlotte Cohn
500 Lafayette Road
St. Paul, MN 55155-4025
Electronically:
Send to environmentalrev.dnr@state.mn.us.
"Rochester Sand and Gravel - North Quarry Project" needs to be included in the subject line. Include your name and mailing address so that you can be added to the mailing list.
By fax:
Submit signed comment letters by fax to 651-297-1500.
Questions
Please call 651-259-5072 if you have questions about this EAW.
Milestone Materials, Rochester Sand and Gravel - North Quarry Project
Documents
Figures
- Figure 1 (Project Vicinity Map)

- Figure 2 (USGS Topographic Map)

- Figure 3 (2010 Aerial Photograph)

- Figure 4 (North Quarry Existing Conditions, 2010)

- Figure 5 (North Quarry Site Plan)

- Figure 6 (Proposed Water Treatment Plan Schematic)

- Figure 7 (Proposed North Quarry Reclamation Plan)

- Figure 8 (Olmsted County Public Waters Inventory Map)

- Figure 9 (National Wetlands Inventory Map)

- Figure 10 (Subsurface Cross-Section Well Locations)

- Figure 11 (Well Locations Cross-Section A - A')

- Figure 12 (Well Locations Cross-Section B - B')

- Figure 13 (Minnesota Department of Health County Well Index Wells)

- Figure 14 (County Well Index Display Index)

- Figure 15 (County Well Index Display, Northwest Quadrant)

- Figure 16 (County Well Index Display, Northeast Quadrant)

- Figure 17 (County Well Index Display, Southwest Quadrant)

- Figure 18 (County Well Index Display, Southeast Quadrant)

- Figure 19 (Groundwater Contour Map)

- Figure 20 (Federal Emergency Management Agency Floodway Map)

- Figure 21 (Olmsted County Flood Insurance Rate Map)

- Figure 22 (Olmsted County Floodplain Zoning Map)

- Figure 23 (Soils Map)

- Figure 24 (Karst Features)

- Figure 25 (Karst Features, 3 Meter DEM)

Attachments
- Attachment 1 (MN DNR Natural Heritage Information System)

- Attachment 2 (State Historic Preservation Office)

Appendices
This information is available in an alternative format upon request. Email the DNR Information Center at info.dnr@state.mn.us or call at 651-296-6157 or 888-MINNDNR.