PolyMet Mining Inc./NorthMet Project
Scoping EAW
The DNR and U.S. Army Corps of Engineers took comments on the proposed EIS scope during a 30-day scoping period that concluded on July 6, 2005. A public scoping meeting was held on June 29, 2005, in Hoyt Lakes, Minnesota. The Final Scoping Decision operates as a blueprint for EIS preparation.
- Scoping EAW
(1.2mb) - Draft Scoping Decision
(112kb) - Figure 5-1
(1.2mb) - Figure 5-2
(2.3mb) - Figure 5-3
(2.3mb) - Figure 5-4
(5.4mb) - Figure 5-5
(654kb) - Figure 5-6
(1.2mb) - Figure 5-7
(2.4mb) - Figure 6-1
(113kb) - Figure 6-2
(514kb) - Figure 6-3
(892kb) - Figure 6-4
(603kb) - Figure 11-1
(1.3mb) - Figure 11-2
(1.3mb) - Figure 11-3
(2.2mb) - Figure 11-4
(2.5mb) - Figure 11-5
(2.9mb) - Figure 11-6
(2.3mb) - Figure 12-1
(2.5mb) - Figure 12-2
(2.5mb) - Figure 12-3
(2.5mb) - Table 12-1
(12kb) - Table 12-2
(12kb) - Table 12-3
(10kb) - Table 12-4
(12kb) - Figure 13-1
(2.2mb) - Figure 17-1
(2.6mb) - Figure 17-2
(2.5mb) - Figure 17-3
(2.5mb) - Table 17-2
(166kb) - Figure 18-1
(1.3mb) - Figure 19-1
(2.5mb) - Figure 20-1
(1.0mb) - Table 23-2
(110kb) - Table 23-3
(110kb) - Appendix A
(136kb)
This information is available in an alternative format upon request. Email the DNR Information Center at info.dnr@state.mn.us or call at 651-296-6157 or 888-MINNDNR.
