Marsh Lake Ecosystem Restoration Project

Environmental Assessment Worksheet (EAW)

Documents

Minnesota Department of Natural Resources

United States Army Corps of Engineers

Review Period

A 30-day public review and comment period was open from October 3, 2011 through November 2, 2011. Public notice of the availability of this EA and EAW was in the October 3, 2011 EQB Monitor This is a PDF file. You will need Adobe Acrobat Reader to download it. This link leads to an external site..

The Proposed Project

The United States Army Corps of Engineers (USACE) and the Minnesota Department of Natural Resources (MNDNR) propose restoring the Pomme de Terre River to its historic channel, breaching the dike at the abandoned fish pond, constructing a drawdown water control structure on the existing overflow spillway on the Marsh Lake Dam, constructing Louisburg Grade Road gated culverts, and modifying the Marsh Lake Dam to include a fishway.

Questions

Please call 651-259-5162 if you have questions about this EAW.