Using the MNDNR Permitting and Reporting System
If you are using MPARS for the first time, you will need to create an account. MPARS is the easiest and most convenient method for most people to request permits for projects that impact Minnesota's water resources, and allows for faster response times.
Click here to learn about permitting requirements for water-related projects.
Water-related program contact information
Projects that impact Minnesota's water resources are regulated by a variety of state, local, and federal agencies. In many cases, a permit is required from one or more of these agencies before proceeding with the project. Check the county-by-county listing to find the local agency contacts in your area.
Preliminary well construction assessment
A preliminary assessment is required before drilling a well that will be used to withdraw more than 10,000 gallons of water per day or 1 million gallons per year.
If you prefer to request an assessment using a paper form, contact the DNR Water Permits and Reporting staff at 651-259-5724.
Water appropriations permit
A water use permit is required for all water users in Minnesota withdrawing more than 10,000 gallons of water per day or 1 million gallons per year from a surface water or groundwater. Click here for permit information
Infested waters diversion or transportation permit
Click here for permit information
If you plan to appropriate and use water in excess of 10,000 gallons per day or 1 million gallons per year from a listed infested water, you need to apply for a water appropriation permit.
If your appropriation will be less than 1 million gallons per year and 10,000 gallons per day from listed infested waters, download and print the application form for submission.
Public waters work permit
Projects constructed below the ordinary high water level (OHWL), which alter the course, current, or cross section of public waters or public waters wetlands, may require a public waters work permit. Such projects may also require an aquatic plant management control permit or a fishery related permit.
General Permit 2008-0401, Temporary Authorization of Dock Platforms (January 2008)
General Permit 2001-1172, Reissued for repair of flood damages
Dam safety permit
Guidelines (construction, alteration, repair, or removal of dams)
Dam safety forms (use Public Waters Work Permit forms)
Contact the State Dam Safety Engineer, 651-259-5715, for further information.
Aquatic plant management control permit
Apply online if you are already certain that your project will require a permit. A permit may be required for removal of aquatic plants, algae, swimmer's itch or leaches.
If you believe that the growth of aquatic plants near your shoreline creates a nuisance, and are uncertain if your project will require a permit, use this flowchart to help pinpoint the steps necessary to identify appropriate control options.
Fishery related permit
Fishery related permits are required for several types of fish removal and transport as well as to operate lake aeration systems. These include:
Aeration system operation
Aquatic plant management
Educational Fishing License Waiver for Students
Fish transport and stocking
Fisheries research
Fishing tournament regulations
Rough fish removal
Lake aeration permit
A permit is required to operate and install an aeration system during periods of ice cover on public waters in Minnesota. Find information regarding permits on the Lake Aeration Program page.