Overview: Why an SEIS is being prepared
On July 29, 2026, NewRange notified the DNR of proposed changes to their NorthMet Project. Under state law, the DNR, as the responsible governmental unit (RGU), is required to prepare a Supplemental Environmental Impact Statement (SEIS) when a project’s proposed changes to the project are substantial and affect the potential for significant environmental impacts of the project or if there is new information that could significantly affect those potential impacts. The DNR determined that the proposed changes by NewRange to its NorthMet Project require preparation of an SEIS.
Record of Decision: Determination on the Need for a Supplemental Environmental Impact Statement for the NewRange NorthMet Mining Project.
- ROD Reference Materials
- Information compiled by the RGU
Finding 69:
Correspondence from NewRange Copper Nickel to DNR. Request to Supplement a Final Environmental Impact Statement. July 29, 2026.
Finding 70:
A. Query 1 (Aug. 4, 2026)
B. Query 2 – Closure Condition of the TRSF (Aug. 4, 2026)
C. Query 3 – Clarification on Figure 2 (Aug. 4, 2026)
D. Query 4 – Primary Crusher (Aug. 4, 2026)
E. Query 5 – Closure Condition for the OSP and OSLA (Aug. 4, 2026)
F. Query 7 – Permits and Approvals with attachment (Aug. 4, 2026)
G. Query 3 – Clarification on Figure 2 with attachments (Aug. 5, 2026)
H. Query 6 – Plant Site Change in Mining Area of Disturbance (Aug. 7, 2026)
I. Query 9 – Existing Pits at Proposed TSF with attachment (Aug. 10, 2026).
J. Query 10 – Confirming Pit 2 and Figure Component with attachment (Aug. 10, 2026)
K. Query 11 – Colby Lake Appropriations (Aug. 10, 2026)
L. Query 12 – Mine Site Equalization Basin (Aug. 11, 2026)
M. Query 13 – Mine Support Facilities (Aug. 11, 2026)
N. Query 14 – Waste Rock Generation (Aug. 11, 2026)
O. Query 8 – Status of WWTS (Aug. 11, 2026)
Finding 71:
Barr Engineering. 2017. Proposed Waste Water Treatment System (WWTS) Relocations (version 2). Memo. April 5, 2017
Fond du Lac Band of Lake Superior Chippewa. 2026. Request for Government-to Government Consultation on NewRange Copper Nickel LLC’s Proposed NorthMet Project Design. Correspondence. Sept. 11, 2026. DNR consulted with Fond du Lac on Oct. 5, 2026.
Grand Portage Band of Lake Superior Chippewa. 2026. Formal request for Government-to-Government Consultation and Objection to Lack of Tribal Notification Regarding Mining-Related Actions in the 1854 Ceded Territory, Including Mile Post 7 (Northshore Mining) EAW and the NorthMet/NewRange Supplemental EIS Determination. Correspondence. July 30, 2026. DNR consulted with Grand Portage on Sep. 9, 2026.
Minnesota DNR. 2005. NorthMet Mine and Ore Processing Facilities Project – Final Scoping Decision. Decision. Oct. 25, 2005.
Minnesota DNR. 2016. Final Environmental Impact Statement: NorthMet Mining Project and Land Exchange. Document. Oct. 19, 2015.
2016 FEIS Chapter 3. Proposed Action and Alternatives.
2016 Final EIS Chapter 5. Environmental Consequences.
2016 Final EIS Chapter 7. Comparison of Alternatives and Other Considerations.
Minnesota DNR. 2016. In the Matter of the Final Environmental Impact Statement for the PolyMet Mining, Inc., NorthMet Mining Project and Land Exchange, St. Louis County, Minnesota, Pursuant to Minnesota Rules, Parts 4410.0200 to 4410.6500. Record of Decision. March 3, 2016.
Minnesota DNR. 2026. NewRange Communications to DNR on Changes in Land Ownership and/or Control. Aug. 13, 2026.
Minnesota DNR. 2026. Summary Tribal Consultation Notes: DNR-Grand Portage Band (Sept. 9, 2026) and DNR-Fond du Lac Band (Oct. 5, 2026) RE: NewRange Request for Supplemental EIS. Oct. 8, 2026.
Minnesota EQB. 2010. EQB Monitor – Volume 34, No. 22. Official Notice. Nov. 1, 2010.
Minnesota EQB. 2010. Guide to Minnesota Environmental Review Rules. Guidance. May 2010.
Minnesota Supreme Court. 2021. In the Matter of the NorthMet Project Permit to Mine Application Dated December 2017 (A18-1952, A18-1958, A18-1959), and In the Matter of the Application for the Dam Safety Permits 2016-1380 and 2016-1383 for the NorthMet Mining Project (A18-1953, A18-1960, A18-1961). Decision. April 28, 2021.
Minnesota Supreme Court. 2023. In the Matter of the Denial of Contested Case Hearing Requests and Issuance of National Pollutant Discharge Elimination System/State Disposal System Permit No. MN0071013 for the Proposed NorthMet Project St. Louis County Hoyt Lakes and Babbitt Minnesota. Nos. A19-0112, A19-0118, A20-1271, A201380, A20-1385. Decision. August 2, 2023.
NewRange Copper Nickel. 2026. NorthMet Project: 2026 Section 404 Permit Application. Permit application and attachments. July 29, 2026.
US Army Corps of Engineers. 2023. CEMVP RD-1999-05528-TJH. Revocation of NewRange Copper Nickel Company Clean Water Act Section 404 Permit. Permit Revocation. June 6, 2023. Executive Summary.
US Army Corps of Engineers. 2026. Public Notice – St. Paul District, Permit Application, No. 1999-05528. Public Notice. Aug. 13, 2026.
US Forest Service. 2017. Final Record of Decision – NorthMet Project Land Exchange. Superior National Forest. Jan. 9, 2017.
WaterLegacy; Minnesota Center for Environmental Advocacy; Friends of the Boundary Waters Wilderness; Fond du Lac Band of Lake Superior Chippewa. 2026. NewRange Project Summary NorthMet Mine – Appropriate Environmental Review. Letter and attachments. Aug. 24, 2026.
The DNR will prepare an independent, state-only SEIS to evaluate the proposed project. The agency understands that the U.S. Army Corps of Engineers (USACE) will prepare a federal SEIS under the National Environmental Policy Act, which serves a similar purpose to the state’s environmental review. The DNR will work cooperatively with USACE to reduce duplication and coordinate its review of the project on matters such as data submittals, analytical approaches and public participation. The DNR will also seek to coordinate with USACE to support a more efficient and aligned engagement and consultation with Tribal governments.
Background: Final EIS
Between 2005 and 2016, the NorthMet Project underwent an extensive environmental review process. In accordance with state and federal laws, a joint state/federal EIS was prepared under the leadership of the DNR, USACE and the U.S. Forest Service (USFS). This process resulted in the NorthMet Mining and Land Exchange Final Environmental Impact Statement. The Final state EIS was deemed adequate by the DNR in March 2016, marking the end of the state's environmental review process.
Next steps: The SEIS process
The SEIS builds on the original 2016 Final EIS by analyzing new information and project changes. It does not replace or reopen the Final EIS. The SEIS will describe the revised project, evaluate potential environmental impacts and consider alternatives and mitigation measures that could reduce those impacts. This information will be used by regulatory agencies when making future permitting and approval decisions. The SEIS itself is not a decision to approve or deny the proposed project. Environmental review is separate from permitting decisions.
The SEIS process includes three phases: 1) Develop and distribute the Preparation Notice; 2) Develop and distribute the draft and final SEIS; and 3) Review and determine the adequacy of the SEIS.
The DNR is currently developing the SEIS Preparation Notice. This document will identify what has changed since the 2016 Final EIS, including new information or circumstances that may affect environmental or socioeconomic impacts. It will also outline issues to be analyzed, project alternatives to be examined, studies to be undertaken and provide a schedule for preparing the SEIS. Once the DNR publishes the Preparation Notice, the public can review it and provide comments.