Posted January 9, 2018
13. Barr Engineering Co. Helicopter Aerial Review of Mine Site Area and Tailings Basin Area. 2010. (3 MB)
14. Barr Engineering Co. NorthMet Project Baseline Wetland Type Evaluation. April 2011. (17 MB)
16. Incorrect citation. No reference should be cited here.
17. Barr Engineering Co. Takings Permit Application - NorthMet Project. October 2017. Please note that reference 17 has been replaced by a revised Takings Permit Application – September 26, 2018 (12 mb)
21. Poly Met Mining Inc. Revised Wetland Permit Application (v2). August 19, 2013. (189 MB)
28. Poly Met Mining Inc. NorthMet Project Project Description (v9). March 2015. (22 MB)
40. Walton, Gary. Data Summary: Rare Plant Survey. 2004. (3 MB)
44. Barr Engineering Co. Sensitive Plant Species Survey Report: PolyMet Plant Site. October 5, 2017. (7 MB)
55. Barr Engineering Co. Wetland Hydrology Monitoring Report 2007-2009. March 2010. (15 MB)
57. Barr Engineering Co. Preliminary Wetland Hydrology Study Report 2005 (RS44). 2006. (21 MB)
58. Barr Engineering Co. Wetland Hydrology Study Plan. June 24, 2005. (3 MB)
59. Barr Engineering Co. Addendum to Wetland Hydrology Monitoring Plan. May 13, 2008. (4 MB)
60. Barr Engineering Co. Addendum to Wetland Hydrology Study Plan. April : 12, 2010. (1 MB)
xx. Barr Engineering Co. Wetland Hydrology Monitoring Report Summary 2005-2016 v1. February 2017. (90 MB)
